Rail Business Daily - Hitachi Rails Over and Back testing solution will enable the fast and seamless switching between existing interlocking (a railway signalling system) and the soon to be introduced new digital signalling system (European Train Control System ETCS L2) being introduced as part of South East Queenslands Cross River Rail project. The solution will radically cut the time and costs associated with testing.