Peak demand in January 2024 is projected at 230 GW, higher than 210.6 GW maximum demand met in January this year ago, while February 2024 is expected to see 222 GW peak power demand, against about 210 GW in February this year. The December peak is projected at 220 GW, likely in the second half of the month. So far in the month, "maximum demand met" has reached 203 GW in the solar hours. A year ago the peak was 205 GW.