Highway 97 rockslide: Two lanes open starting Friday
The highway was closed Aug. 28 because of the rockslide. Since Sept. 11, it has been operating with single-lane-alternating traffic as crews worked to stabilize the hillside.
The highway was closed Aug. 28 because of the rockslide. Since Sept. 11, it has been operating with single-lane-alternating traffic as crews worked to stabilize the hillside.