After 3-year closure, Bobcaygeon swing bridge reopens to traffic: Parks Canada
The bridge spanning bridge over Lock 32 of the Trent-Severn Waterway (TSW) had been closed for construction since November 2020.
The bridge spanning bridge over Lock 32 of the Trent-Severn Waterway (TSW) had been closed for construction since November 2020.